alert

* Route 79 Project Advisory *

white X to close events bar

Information

Fire Prevention Bureau Fees

 

 

Description Price
Review of Building Plans Minimum $.05 per square feet, $100
Permit for Storage of Black Powder $60.00
Copies of Report or Record, Each Copy $15.00
Permit to Store Hazardous Materials $50.00
Permit to Process Hazardous Materials $50.00
Permit to Erect a Tent $50.00
Permit for the Installation of Sprinklers, Alarms $50.00
Permit to Fire a Mortar or Cannon $50.00
Permit to Store and use Oxyacetylene Tanks and Torches $50.00
Permit for a Supervised Display of Fireworks $60.00
Permit to Conduct Blasting $60.00
Renewal of Permit $50.00
Permit to Store Flammable Liquids, Gases, or Solids $50.00
Permit to Install Liquefied Petroleum Gas Facility $50.00
Permit to Store Liquefied Petroleum Gas $50.00
Permit to install or alter an Oil Burner $50.00
Permit to Remove a Basement Oil Burner Tank $50.00
Tank Truck Inspection $60.00
Permit for a Tar Kettle $50.00
Permit for the Storage of Fuel Oil $50.00
Permit for the Installation of a Tank Containing Flam./Comb. Liquids $200.00
(New Oil Tank Installation Underground Only)
Permit for the Removal of a Tank Containing Flam./Comb. Liquids $200.00
MGL c. 21E Site Assessment Research $100.00
Permit for the Keeping of Certain Metal Waste Containers $50.00
Permit to Install Fire-Extinguishing Equipment for Commercial Cooking $50.00
Installation or Removal of a Fuel Storage Tank $50.00
Fumigation and Insecticidal Fogging $50.00
Liquor License Inspection $50.00
Rubbish Container > 6 Cubic Yards (Dumpsters) $25.00
Disconnect/Disable Fire Alarm or Sprinkler System $25.00
Unvented Propane or Natural Gas-Fired Space Heaters $50.00
Use, Storage, or Handling of Hazardous Material $50.00
Storage of Mulch > 300 Cubic Yards $50.00
An Operation that Uses or Produces Combustible Dust $50.00
Storage of Fuel Gases $50.00
Quarterly Inspections Mandated by
MGL c. 148, Sec. 4
Hospitals $200.00
All Others $100.00
Initial Fire Alarm Tie-In $375.00
Annual Fire Fee $300.00
Inspections for Compliance with
MGL c. 148, Sec 26
One Unit House $50.00
Two Unit Houses $100.00
Three unit to six Unit Houses $150.00
Seven Unit Houses or more $500.00
Re-inspection Same as Initial Inspection
ALL PREVIOUS PERMITS THAT WERE VALID FOR FIVE YEARS WILL NOW BE VALID FOR TWO YEARS, STARTING NOVEMBER 1, 2016.